News Archives

Member Photos

Get the Flash Player to see the slideshow.

Work Parties

Working Parties 2009

15th Feb        Totham Pit

  • Cleared rubbish from the car park
  • Cleared dead wood and fallen trees from the island and colliers bay
  • Cleared outflow pipe and overgrown vegatation from some of the swims

Photos

 

Working Parties 2008

10th Feb         Beckingham Hall Netting

  • 9 carp moved to Totham Pit / Slough House Farm 

13th Apr          Slough House Farm Car Park (resurfacing)

  • Owner notified of planned works and asked if we may utilise car park on other side of the road while MAS car park is out of bounds
  • Signs put up regarding one night maximum night fishing
  • Car park scraped, reed bed swims dug out and holes made for fence posts
  • Road planings purchased and spread on prepared car parking area 

25th May         Slough House Farm Car Park (fencing)

  • Car park perimeter fence replaced 

6th Jul             Bog Grove Access Track and Car Park (open day preparations)

  • Access track scraped (digger also utilised at Totham Pit to improve the disabled swims, paths and ramp)
  • Grass cut in car park and general tidy up
  • Fallen tree removed 

17th Aug         Slough House Farm (bank side maintenance)

  • Tidy up after the water level returned to normal following work on clearing the blocked outflow pipe (the water level had risen as much as 2½ feet behind the reeds) 

28th Sep         Totham Pit container

  • Only 4 people turned up to this workparty so the reed clearing at Slough House Farm was postponed and the day was spent tidying up the Totham Pit container instead
  • Rubber boat inflated and now ready to use 

9th Nov          Slough House Farm and Howells

  • Concrete strip set into Slough House Farm car park to support gate jockey wheel to aid opening / closing
  • General tidy up including removal of reeds from overgrown swims
  • Signs underneath the power lines at Howells repositioned to make them more prominent 

16th Nov       Stow Maries Netting

  • Fish stock acquired for Bog Grove and Beckingham Hall 

Adhoc:

  • New Hall swims trimmed and bankside growth tidied up
  • Swims and paths renovated and work on digging out proposed stock pond at Totham Pit
  • Gate welding / repairs carried out at Beckingham Hall and padlock attached with thick chain
  • Weed raking at Howells
  • Evening work party at Rook Hall front lake on 11th Aug to clear swims of weed for the concessionary match the following day (won with 13lb 9oz)
  • Fallen tree removed from Rook Hall
  • Padlocks fitted / replaced on container and gates at New Hall and Totham Pit